The basic and detailed design project of the dewatering plant from the tailings of Sirjan Iranian steel concentrate factory
This project is defined with the aim of recovering water from the tailings of Sirjan Iranian steel concentrate factory. With the implementation of this project, it is possible to dewater waste with a capacity of 428 tons of solids per hour by using pressure filter technology.
Client
Sirjan Iranian Steel Co (SISCO)
Status
in progress
Gallery
Description
Construction of stone crushing and transportation system from Jalalabad mine to Zarand concentration complex
The project includes the construction of a gyratory stone crusher with a capacity of about 2000 tons per hour to crush stone and transfer the granulated stone by 4 km conveyor belt to the second and third stage stone crusher to the concentrate factory of Zarand Iranian Steel Company.
Client
Zarand Iranian Steel Co (ZISCO)
Status
Under Design
Gallery
Description
Construction of copper sulfide concentrate processing plant from Jalalabad iron ore concentrate tailings
The purpose of the project is to build a concentrate production factory with a grade of 22%. In this factory, the residual waste from the production process of Zarand iron concentrate factory with a grade of about 0.25% will be used for the production of copper concentrate using the concentration (flotation) method. The amount of feed of the factory is about 1 million tons per year
Client
Zarand Iranian Steel Co (ZISCO)
Status
in progress
Gallery
Description
The project of transfer of molten coke from coking plant number one to coking plant number two of Zarand Iranian steel company in Zarand, Kerman province
The purpose of this project is to transfer the coke produced in coking plant number 1 for cooling in the CDQ unit installed in coking plant number two.
Client
Zarand Iranian Steel Co (ZISCO)
Status
in progress
Gallery
Description
Basic and detailed design of the copper recovery project from the neutralization by-product of Iranian Babak Copper Company
The purpose of this project is to recover the copper contained in the neutralization waste of Babak copper bioleaching plant in Iran
Client
Babak Iranian Copper Co (IBCCO)
Status
in progress
Gallery
Description
Engineering services including basic design, detailed design, purchase engineering and related works related to the construction project of a direct reclamation plant with a capacity of 1.5 million tons per year in Bardsir steel complex.
Client
Sirjan Iranian Steel Co (SISCO)
Status
in progress
Gallery
Description
Construction of used tire reconditioning unit by OTR method, including all MC services of the project, from the stage of land delivery to trial start-up.
Client
Tamin Atieh MIDHCO (TAMIDHCO)
Status
Completed
Gallery
Description
Engineering services including basic design, detailed design, purchase engineering and related works related to the construction project of a direct reclamation plant with a capacity of 1.5 million tons per year in Zarand steel complex.